Organisations that implement traditional management approaches have often observed delays and miscommunications and as a result, unsatisfied stakeholders. The Agile Project Management Framework was created to alleviate these drawbacks and establish a structure and sequence for product development.
In this blog, we will explore principles, types and phases of the Agile Project Management Framework and share successful use cases of implementation. According to Agile Sherpas, enterprises see boosted productivity, empowered roles, and defined responsibilities as the primary benefits of implementing an Agile Project Management Framework.
Table of Contents
1) What is Agile Project Management?
2) Traditional Project Management methodology
3) Traditional Project Management vs Agile Project Management
4) Agile Project Management Framework – Explained
5) Why should you consider the APM Framework?
6) Principles of Agile
7) The five phases of Agile Project Management Framework
8) Steps to implement an Agile Framework
9) Types of Agile Frameworks
10) Agile Frameworks, practices and methodologies
11) Use cases of successful implementation
12) Conclusion
What is Agile Project Management?
If you’re wondering What is Agile Project Management? then this section of the blog is here to answer this very question. Agile Project Management dates back to the late 1950s when pioneers like Bernie Dimsdale, John von Neumann, Herb Jacobs, and Gerald Weinberg unknowingly practised incremental development techniques for IBM and Motorola. Their approach, distinct from the traditional Waterfall model, laid the groundwork for what we now recognise as Agile.
In 2001, a pivotal moment in Agile's history occurred when 17 Software Development professionals convened to explore alternative Project Management methodologies. This gathering resulted in creating the manifesto for Agile Software Development, defining a vision for a flexible, lightweight, and team-oriented Software Development approach.
The Agile manifesto aimed to "uncover better ways of developing software" and established four core values:
1) Prioritising individuals and interactions over processes and tools
2) Preferring working software over comprehensive documentation
3) Favouring customer collaboration over contract negotiation
4) Prioritising responding to change over following a plan
These values departed from rigid processes, emphasising people, collaboration, and adaptability. The 'Twelve Principles of Agile Software' are accompanying the manifesto, offering further guidance for effective Agile implementation.
The Agile manifesto and its principles have become a universal and efficient Project Management approach, extending beyond software development. The Agile philosophy centres on iterative development, continuous customer feedback, and a proactive willingness to adapt to evolving project requirements.
Traditional Project Management methodology
Traditional methodologies adopt a sequential approach to project execution. Consequently, projects move through initiation, planning, execution, monitoring, and closure in consecutive stages.
Commonly referred to as linear, this approach involves several internal phases executed chronologically. Widely employed in industries such as construction and manufacturing, where minimal changes are needed at each stage. Traditional Project Management, including the Waterfall model, has found application in software engineering since the early 1970s.
The Waterfall model, a dominant Software Development methodology, was formally described by Winston W. Royce. He stated, "There are two essential steps common to all computer program developments, regardless of size or complexity. There is first an analysis step, followed by a coding step. This straightforward implementation concept is, in fact, all that is required if the effort is sufficiently small and if the final product is to be operated by those who built it – as is typically done with computer programs for internal use."
The Waterfall model significantly emphasises planning and specification development, consuming up to 40% of the project time and budget. A fundamental principle of this approach is the strict order of project phases, with a new stage commencing only after the completion of the preceding one.
While effective for clearly defined projects with a single deliverable and a fixed deadline, the Waterfall approach demands meticulous planning, extensive project documentation, and tight control over the development process. Theoretically, this should result in on-time, on-budget delivery, low project risks, and predictable outcomes.
The Waterfall method in software engineering is often slow, costly, and inflexible due to numerous constraints. Its inability to adapt the product to evolving market requirements frequently leads to a significant waste of resources and eventual Project failure.
Seeking a skilled navigator for project success? Apply for Project Manager role!
Traditional Project Management vs Agile Project Management
The following provides a distinction between traditional Project Management and Agile Project Management:
Traditional Project Management
1) Sequential approach: Follows a step-by-step, linear progression through initiation, planning, execution, monitoring, and closure.
2) Waterfall model: Commonly associated with the Waterfall model, where each phase is completed before moving on to the next.
3) Emphasis on planning: Strong focus on extensive planning and specifications development, consuming a significant portion of roject time and budget (up to 40%).
4) Rigid order of phases: A new project phase begins when the previous one is completed.
5) Suitable for defined projects: Works well for projects with clearly defined requirements, a single deliverable, and fixed deadlines.
6) Documentation intensive: Requires thorough documentation and control over the development process.
7) Less adaptive to changes: Tends to be slow, costly, and inflexible due to limited adaptability to changes during the project.
8) Risk mitigation through planning: Aim for on-time, on-budget delivery with low project risks through meticulous planning.
Agile Project Management
1) Iterative and incremental: Embraces an iterative and incremental approach with frequent reassessment and adaptation.
2) Collaborative teams: Relies on small, cross-functional teams that collaborate closely throughout the project.
3) Customer involvement: Encourages regular collaboration with customers or end-users for feedback and adjustments.
4) Adaptive planning: Favors responding to change over strictly following a plan, with planning done incrementally.
5) Continuous delivery: Aims to deliver a working product at the end of each iteration or sprint.
6) Change is embraced: Considers and welcomes change as a natural part of the development process.
7) Suitable for dynamic projects: Well-suited for projects with evolving requirements and a need for flexibility.
8) Higher flexibility: More adaptive and responsive to changes, reducing the risk of project failure due to evolving market requirements.
Unlock your potential and drive your career forward with our SAFe Agile Certification!
Agile Project Management Framework – Explained
Agile Project Management is an iterative and flexible collection of methodologies that helps in managing projects with an emphasis on collaboration, rapid iteration, and continuous feedback. The Agile Framework is based on the Agile Manifesto, a set of principles and values that focus on customer satisfaction and agility of responsiveness. The framework is designed to adapt to changing circumstances, making it ideal for projects with uncertain or rapidly evolving requirements.
The framework has gained popularity across different industries as organisations recognise the need to be more responsive to customer needs and market trends.
The process consists of a series of short, iterative cycles called “sprints”, during which the team works on specific tasks and goals. The team collaborates closely with stakeholders throughout the project to ensure that the final product meets their needs.
The Agile Framework is also designed to empower teams to make decisions and solve problems independently, rather than relying on a top-down corporate hierarchy. While these frameworks have become extremely popular in the Software Development field, they can also be applied to a variety of projects in a wide range of industries.
Why should you consider the APM Framework?
The Agile Project Management Framework gives users numerous efficiency and effectiveness benefits. The most significant benefit it offers to Agile Project Management is its ability to quickly change the project's direction to meet the changing demands.
In traditional Project Management methodology, there are too many processes, and incorporating changes takes a lot of work. Agile Project Management principles give complete freedom to the team members and prioritise customer demands over other factors.
Principles of Agile
Before diving deeper into the actual framework, it is important to understand the principles it is based on. The principles of Agile are as follows:
a) Customer collaboration over contract negotiation: Agile emphasises the importance of collaboration between the project team and the customer to ensure that the project meets the customer’s needs. Customer feedback is solicited frequently and is used to guide the project’s direction.
b) Working software over comprehensive documentation: Agile emphasises working software over comprehensive documentation. Documentation is kept to a minimum and created only when necessary to support the development process.
c) Responding to change over following a plan: Agile recognises that change is inevitable and that a flexible approach is required to respond to changing requirements. The project team adapts to changing requirements and priorities through continuous feedback, and collaboration with the customer.
d) Interactions over processes: Agile emphasises the importance of people and collaboration over processes and tools. The project team works closely together to achieve the project goals, with a focus on collaboration and communication.
e) Continuous delivery over phased delivery: Agile emphasises delivering value to the customer quickly, through continuous delivery of working software. The project is broken down into chunks that are smaller and more manageable, with each chunk delivering value to the customer.
f) Sustainable development over quick fixes: Agile emphasises the importance of establishing a sustainable structure such as test-driven development and continuous integration. This helps ensure that the project is built to last, rather than relying on quick fixes that may not be sustainable over time.
g) Embracing change: Agile recognises that change is inevitable and that a flexible approach is required to respond to changing requirements. The project team continuously updates its priorities through collaboration with the customer.
h) Self-organising teams: Agile relies on self-organising teams that are empowered to take ownership of the project and make decisions. The development team works in tandem to achieve the project goals, with a focus on communication.
The five phases of Agile Project Management Model
The Agile Framework is systematically categorised into five phases, each of which is critical for the project. They are as follows:
1) Envision Phase
The first phase of the Agile Framework is the planning phase, where the project team defines the range of the project, its goals, and objectives. This phase involves creating a product backlog, i.e., a list of all the features and functionalities that the team needs to develop.
During this stage, the product idea is developed, and all individuals or groups involved in the project are recognised. The potential goals of the project, and the determination of the customer's requirements are also integral aspects of this phase.
2) Speculate Phase
The team then breaks down the backlog into smaller tasks and estimates the time and effort required for each task. By the completion of the Envision Phase, the entire team should have a clear understanding of how, what, and when it needs to be done.
The Speculation Phase typically involves two primary tasks:
1) Decomposing the project into a set of overarching milestones and establishing the anticipated project schedule.
2) Developing an initial comprehension of the essential tasks within the project. During this phase, certain tasks are prioritised over others, and the team collaboratively determines the approach for ensuring the quality of the final project outcome.
3) Explore Phase
This phase runs parallel with the project execution , where team members investigate different options to meet project requirements within set limitations. The primary objective is to generate value and uphold the final deliverable's quality.
Much like most Agile approaches, teams concentrate on a solitary milestone, refining their work until it reaches excellence. This phase operates concurrently with the Adapt Phase, as teams might need to adjust their strategy and implementation approach in response to customer requests or unexpected feedback.
4) Adapt Phase:
The execution phase is where the actual work takes place. The primary emphasis lies in generating value and upholding the quality of the ultimate deliverable.
This phase involves a series of sprints, where the team works on a set of tasks for a fixed period, typically two to four weeks.The team's capacity to adjust to varying situations equips them to handle whatever challenges come their way.
During each sprint, the team focuses on completing the tasks assigned to them, testing the work done, and getting feedback from the stakeholders. The team holds daily stand-up meetings to ensure progress, resolve any issues, and plan for the next day. At the end of each sprint, the team presents a working increment of the product to the stakeholders for feedback.
5) Closing Phase:
The Closing Phase is the final phase of the Agile Framework, where the project is completed and delivered to the stakeholders. This phase typically involves reviewing the project, documenting any lessons learned, and implementing them in the development of the next project.
The team presents the final product to the stakeholders for acceptance and sign-off. The team then conducts a retrospective to evaluate the project, identify areas for improvement, and celebrate their achievements. The retrospective presents an opportunity for the team to reflect on their performance, identify what they have worked on during the development process, and make changes for future projects.
Dive into the world of Agile Project Management with our Agile Project Management Black Belt training course.
Steps to implement an Agile Framework
Implementing an Agile Framework requires several steps. Listed below is an overview of the process:
a) Evaluate your organisation’s readiness: Before implementing a framework, it is important to assess your organisation’s readiness for the change. This includes understanding the culture, the current development process, and the level of trust from leadership and team members.
b) Select a methodology: There are several Agile methodologies to choose from, such as Scrum, Lean, and Kanban. Each methodology has its own set of principles and practices, so it’s important to choose one that aligns with your organisation’s goals and values.
c) Form a team: An Agile team typically consists of several predefined roles such as Product Owner, Scrum Master, and a Development Team. The Product Owner is responsible for defining the vision of the project and prioritising the backlog. The Scrum Master is responsible for ensuring that the team is following the practices of the methodology and removing any hindrances to progress. The Development Team is responsible for delivering the final product or increments to the product.
d) Define the project scope: Define the scope of the project and identify the features and increments that need to be delivered. This helps the team create a backlog of user stories that can be prioritised and worked on.
e) Create a product backlog: The product backlog is a prioritised list of user stories that the team will work on during the project. The Product Owner is responsible for creating and prioritising the backlog, and the team can then estimate the effort required to deliver each item.
f) Conduct sprint planning: A sprint is a fixed-length period of time during which the team works to deliver a set of features. During sprint planning, the team selects items from the product backlog to work on during the sprint, and they estimate the effort and time required to deliver each item.
g) Conduct daily stand-up meetings: Daily stand-up meetings are short meetings held every day to keep the team aligned on progress, issues, and plans. Each team member provides a brief update on what they have been working on, or what they plan to work on next, and any issues or obstacles they are facing.
h) Conduct sprint review and retrospective: At the end of each sprint, the team conducts a sprint review to demonstrate the work completed during the sprint and receive feedback from stakeholders. The team also conducts a retrospective to reflect on the sprint and identify areas for improvement.
i) Continuously refine: Agile is an iterative process, so it is important to continuously refine and improve the process to make the next project more efficient. This includes regularly reviewing and adapting the process based on feedback and data.
Acquire the fundamental skills on agile methodologies by signing up for our course on Agile Project Management Foundation (AgilePM®) now!
Types of Agile Frameworks
There are several types of Agile Frameworks, each with its own unique approach to delivering software. Listed below are the five most popular types of frameworks:
a) Scrum: Scrum is a popular framework for managing and completing complex projects. It is based on small, self-organising teams that work in short iterations called sprints. Each sprint typically lasts between one and four weeks and ends with a review meeting to assess progress and plan the next sprint. Scrum relies on a set of defined roles, including a Product Owner, a Scrum Master, and a Development Team. It also includes various ceremonies such as daily stand-up meetings and sprint retrospectives.
b) Kanban: Kanban is a visual framework that has Japanese origins and means an instruction card or a visual signal. It is based on the principle of limiting the amount of work in progress to improve efficiency and reduce waste. In Kanban, work items are represented by cards on a board, and each card is moved through distinct stages of completion. The goal is to keep the flow of work moving steadily through the system. Kanban does not prescribe specific roles, ceremonies, or time boxes, making it highly customisable to fit different team needs.
c) Extreme Programming (XP): XP is an Agile methodology that focuses on delivering high-quality software through continuous testing and feedback. It emphasises practices such as pair programming, test-driven development, continuous integration, and continuous deployment. XP teams work in short iterations, typically two weeks or less, and prioritise delivering working software at the end of each iteration. The framework exhibits the principles of uniformity, simplicity, feedback, endurance, and collaboration.
d) Lean: Lean is an Agile methodology that focuses on maximising value and minimising waste. It is based on the principles of Lean manufacturing and emphasises continuous improvement, customer satisfaction, and respect for people. Lean software development includes practices such as Just-in-Time (JIT) delivery, continuous flow, and pull systems. It also encourages teams to focus on eliminating waste, reducing cycle time, and improving quality.
e) Crystal: Crystal is a family of methodologies that emphasises simplicity, flexibility, and communication. It includes various flavours, such as Crystal Clear, Crystal Red, and Crystal Orange. Each flavour is tailored to different project sizes and team structures. Crystal focuses on creating a culture of trust, where team members are empowered to make decisions and take ownership of their work. It also includes practices for improving communication, such as daily meetings and informal check-ins.
Gain a detailed understanding of how Agile practices work and how to implement them by enlisting for Certified Professional In Agile Project Management (CPAPM) now!
Agile Frameworks, Practices, and Methodologies
Agile is a broad category encompassing many methodologies and practices, all rooted in the principles and values mentioned earlier. Each of these approaches possesses unique characteristics and specific applications. Among the prominent methods and techniques are Scrum, Kanban, Hybrid, Lean, Bimodal, XP, and Crystal. Before delving into a deeper discussion of these, it's essential to understand their fundamental traits.
In a linear model, this method involves a series of consecutive internal stages in chronological sequence. It is primarily used in industries like construction and manufacturing, where minimal alterations are needed during each phase. Software engineering has also adopted the conventional Project Management approach.
Scrum stands out as a prominent Agile methodology that outlines the procedural sequence. Its primary focus is fostering robust cooperation among individuals engaged in intricate product development, where frequent modifications and additions occur. This methodology relies on structured interactions among three key roles, each with specific responsibilities: the Scrum Master, Product Owner, and the Development Team.
Use cases of successful implementation
Here are five use cases of successful Agile implementation:
a) Software development: Agile Frameworks are widely used in software development. They allow teams to continuously deliver working software in small iterations, gather feedback from users, and make changes accordingly. Companies such as Spotify, Microsoft, and Amazon have adopted Agile for their software development processes.
b) Marketing campaigns: Agile Frameworks can also be applied to marketing campaigns. With an Agile approach, marketers can quickly test different messages and channels, gather data, and adjust their strategy based on the results. This approach has been used by companies such as Coca-Cola and Airbnb.
c) Product development: Agile Frameworks are well-suited for product development because they allow teams to quickly adapt to changes in customer needs and market trends. Companies such as Google and Apple have used this methodology to develop household brands such as Gmail and the iPhone.
d) Construction projects: Agile Frameworks can also be used in construction projects. By breaking down large projects into smaller, more manageable tasks, construction teams can complete work more efficiently and adapt to changes in project requirements. Companies such as Skanska have successfully used Agile in construction projects.
e) Human resources (HR): Agile Frameworks are applied in HR processes such as performance management and talent acquisition. By adopting an Agile approach, HR teams can quickly respond to changes in business needs and adjust their processes accordingly. Companies such as General Electric (GE) and Randstad have used Agile in their HR processes.
Conclusion
In conclusion, Agile Project Management Framework is a flexible and iterative approach that enables Project Management teams to adapt to changing requirements, customer needs, and market conditions. By breaking down projects into small, manageable chunks, teams can deliver value incrementally and respond quickly to feedback.
The framework has gained popularity across different industries as organisations recognise the need to be more responsive to customer needs and market trends. However, it is not a one-size-fits-all solution, and the success of Agile depends on the organisation’s willingness to embrace change and commitment to its principles. Therefore, if you are considering implementing an Agile Project Management Framework in your organisation, it is crucial to invest in training, coaching, and continuous learning to fully leverage its benefits.
Learn how to implement agile methodology on your projects. Sign up for our course on Agile Project Management Practitioner (AgilePM®) now!
Frequently Asked Questions
Agile Project Management is an approach to managing projects, prioritising flexibility and collaboration. Simply put, it involves breaking down a project into small, manageable parts and continuously reassessing and adapting the plan as the project progresses. The focus is on delivering value to the customer through iterative development, regular feedback, and a willingness to embrace changes in requirements.
In Agile Project Management, the process unfolds through key phases. "Envisioning" establishes the project's vision and identifies stakeholders. The "Speculating" phase involves high-level planning and initial requirement discussions. As the project progresses, the "Exploring" phase refines details and creates a comprehensive plan. The core of Agile lies in the "Adapting" phase, emphasising iterative development and continuous adjustments based on feedback. T
he final "Closing" phase involves wrapping up the project, evaluating outcomes, and capturing lessons learned for future improvements. Collectively, these phases embody Agile's emphasis on adaptability, collaboration, and continuous improvement throughout the project lifecycle.
One of the most well-known examples of Agile Project Management is the Scrum framework. In Scrum, projects are divided into fixed-length iterations called sprints, usually lasting two to four weeks. Cross-functional teams collaborate closely, and a potentially shippable product increment is delivered at the end of each sprint. This iterative and incremental approach allows flexibility, adaptability to changing requirements, and continuous delivery of valuable features. Other examples of Agile Frameworks include Kanban, Extreme Programming (XP), and Lean.
The Knowledge Academy takes global learning to new heights, offering over 30,000 online courses across 490+ locations in 220 countries. This expansive reach ensures accessibility and convenience for learners worldwide.
Alongside our diverse Online Course Catalogue, encompassing 17 major categories, we go the extra mile by providing a plethora of free educational Online Resources like News updates, blogs, videos, webinars, and interview questions. Tailoring learning experiences further, professionals can maximise value with customisable Course Bundles of TKA.
The Knowledge Academy’s Knowledge Pass, a prepaid voucher, adds another layer of flexibility, allowing course bookings over a 12-month period. Join us on a journey where education knows no bounds.
Explore Agile Courses with The Knowledge Academy, where more courses await, including Agile for Teams, Agile Overview, and Agile Change Agent. Tailored for various skill levels, these courses offer in-depth insights into Agile methodologies.
Dive into our Project Management blogs, a trove of resources covering Agile topics. Whether you are a beginner or aiming to enhance your Project Management skills, The Knowledge Academy's diverse courses and insightful blogs are your go-to source.
Upcoming Project Management Resources Batches & Dates
Date
Mon 25th Nov 2024
Mon 2nd Dec 2024
Mon 9th Dec 2024
Sat 14th Dec 2024, Sun 15th Dec 2024
Mon 16th Dec 2024
Mon 6th Jan 2025
Mon 13th Jan 2025
Mon 20th Jan 2025
Mon 27th Jan 2025
Mon 3rd Feb 2025
Mon 10th Feb 2025
Mon 17th Feb 2025
Mon 24th Feb 2025
Mon 3rd Mar 2025
Mon 10th Mar 2025
Mon 17th Mar 2025
Mon 24th Mar 2025
Mon 31st Mar 2025
Mon 7th Apr 2025
Mon 14th Apr 2025
Tue 22nd Apr 2025
Mon 28th Apr 2025
Tue 6th May 2025
Mon 12th May 2025
Mon 19th May 2025
Tue 27th May 2025
Mon 2nd Jun 2025
Mon 9th Jun 2025
Mon 16th Jun 2025
Mon 23rd Jun 2025
Mon 30th Jun 2025
Mon 7th Jul 2025
Mon 14th Jul 2025
Mon 21st Jul 2025
Mon 28th Jul 2025
Mon 4th Aug 2025
Mon 11th Aug 2025
Mon 18th Aug 2025
Mon 25th Aug 2025
Mon 1st Sep 2025
Mon 8th Sep 2025
Mon 15th Sep 2025
Mon 22nd Sep 2025
Mon 29th Sep 2025
Mon 6th Oct 2025
Mon 13th Oct 2025
Mon 20th Oct 2025
Mon 27th Oct 2025
Mon 3rd Nov 2025
Mon 10th Nov 2025
Mon 17th Nov 2025
Mon 24th Nov 2025
Mon 1st Dec 2025
Mon 8th Dec 2025
Mon 15th Dec 2025